Last look inside Super-K

January 2019: the SK tank is almost filled with water. This month we remove our ropes and boats and other tools, close up the top reflective Tyvek, place the PMTs back in place over the hatch opening (shown here) and close up the detector for final filling.

This entry was posted in Uncategorized. Bookmark the permalink.