HV-Block progress Posted on March 13, 2013 by gastler HV-Block with pulse injection and SHV connectors. Next job is figuring out conformal coating order of operations.
PMT Test Apparatus Posted on March 11, 2013 by gastler Chris showing off his new diffuser. Chris doing science with the new lecrunch DAQ. NIM electronics for pulser, PMT trigger, and gate generator.
Top Hats Being Crated Posted on March 8, 2013 by linden A shipment of delicious stainless steel pies is almost ready.
PMT Cold Test with LED pulser Posted on March 8, 2013 by gastler LED pulser box built by grad student Chris Kachulis. Histogram of cold PMT SPEs (~5pC) at 1150V. Dan showing off the working PMT test electronics.