First argon gas data Posted on January 30, 2014 by linden The detector was filled with gaseous argon for the first time today. The triplet scintillation peak is already clearly visible!
Cabling Posted on December 19, 2013 by linden 92 PMT cables + 92 HV cables + 92 signal cables = several shifts of nothing but labelling, running, and plugging in cables.
Top Hats Being Crated Posted on March 8, 2013 by linden A shipment of delicious stainless steel pies is almost ready.