Top hats delivered. Posted on October 26, 2012 by kearns Two crates full of top hats have been delivered to BU and moved to the MACRO lab, waiting for PMT testing and assembly.
13 WFDs Posted on September 24, 2012 by kearns Here is a full crate of WFDs, drawing 65 amperes at 5V. Thanks to TRIUMF and U. Penn for loaning extra modules.