Silicon Track Trigger
my home page
Level-2 page
Fermilab STT page
BU STT page
STT hardware documentation
pictures
documents
- STT section for
D0 Run 2 NIM paper (fig1, fig2, fig3, fig4a, fig4b)
- DØ note 3363 "Road Definition for Silicon Track Trigger"
- DØ note 3420 "Organization of CFT Input to Silicon Track Trigger"
- DØ note 3421 "Cluster Centroid Algorithm for STT"
- DØ note ???? "Computation of Roads for Silicon Track Trigger"
- DØ note 3594 "Observability of the Decay Z-bb in Run II" (figures 1, 2, 3, 4, 5, 6)
- DØ note 3510 "A Silicon Track Trigger for the DØ Experiment in Run II - Technical Design Report" (STT review 3/12/98)
- DØ note ???? "Specification of L2STT system for queuing simulations"
- DØ note ???? "Data links in the L2STT system"
- "Map of SMT barrel detectors into L2STT crates" pdf
- VBD manual
- SCL receiver, schematic, dimensions
- "Data Output from L2STT to Level 3" pdf
- STT review documents
- "Proposed Cable Map for SMT Sector 1" MSword pdf
- DØ note 4016 "Numbering Convention for Sequencer ID in SVX Data Stream"
- Manuel Martin's L1CTT protocol
slides
- Required capabilities of Silicon Track Trigger
- Pro's and con's of FIC/SLIC/Alpha option and baseline design
- Timing performance of FIC/SLIC/Alpha option and baseline design
- PAC presentation (presented to Fermilab PAC on October 23, 1998)
- answers to PAC (presented to Fermilab PAC on October 24, 1998)
- Block diagram of L1/L2 trigger (xfig or eps file)
- PAC January 15, 1999
- Specification of L2STT system for queuing simulations (Nevis STT workshop, September 24, 1999)
- Data links in the L2STT system (Nevis STT workshop, September 24, 1999)
- Status of L2STT summary slide (D0 collaboration
meeting, October 6-8, 1999)
- D0 run II meeting, December 10, 1999
- L2 Silicon Track Trigger (pdf) (D0 2000 Workshop, June 20, 2000)
- Trigger Timing (June 30, 2000)
proposals for silicon track trigger
links
last updated July 12, 2000 by Ulrich Heintz